LIVE
Saving a Water-Damaged Smartphone: 4 Mistakes to Avoid EU spent more on Russian energy than on aid to Ukraine, European Commission data shows SpaceX hires Washington lobbyists ahead of potential US Congressional probes Geopolitical summit in China: expert assessment of the meeting between US, Chinese, and Russian leaders Strikes on the Crimean Bridge: Economic Impact on Logistics and Shipping EU to Provide €1 Billion for Military Equipment for Ukraine Technological Superiority and the Crimean Bridge: Expert Analysis Zelenskyy Reaffirms Legitimacy of Strikes on Crimean Bridge Russian strike destroys Fresh Production Group's film studio Energy infrastructure in Rivne region damaged by attack: 50 settlements left without power Saving a Water-Damaged Smartphone: 4 Mistakes to Avoid EU spent more on Russian energy than on aid to Ukraine, European Commission data shows SpaceX hires Washington lobbyists ahead of potential US Congressional probes Geopolitical summit in China: expert assessment of the meeting between US, Chinese, and Russian leaders Strikes on the Crimean Bridge: Economic Impact on Logistics and Shipping EU to Provide €1 Billion for Military Equipment for Ukraine Technological Superiority and the Crimean Bridge: Expert Analysis Zelenskyy Reaffirms Legitimacy of Strikes on Crimean Bridge Russian strike destroys Fresh Production Group's film studio Energy infrastructure in Rivne region damaged by attack: 50 settlements left without power

Lviv to upgrade medical center: 80 million UAH tender announced

🏢 Бізнес 1 min read 👁 2

The Lviv medical association has announced a tender for the capital repair of the 'Pivdennyi' diagnostic center, estimated at over 80 million UAH.

Lviv to upgrade medical center: 80 million UAH tender announced🏢Бізнес

Photo: delo.ua

Key points

  • Expected cost of works is 80.7 million UAH
  • Renovation covers the third and fourth floors
  • Completion date scheduled for August 31, 2027

The First Clinical Territorial Medical Association of Lviv has initiated a major upgrade of the 'Pivdennyi' diagnostic and treatment center. Information regarding the procurement has been published in the Prozorro system, with the expected cost of the works set at 80.7 million UAH.

Modernization project details

According to the tender documentation, the capital repair will cover the third and fourth floors of the building. The contractor is expected to perform a complex range of interior works, including the replacement of windows and doors, as well as finishing walls, floors, and ceilings. Significant attention is given to upgrading utility networks, with plans for a full overhaul of water supply, sewage, heating, and ventilation systems.

The project also emphasizes accessibility. Specifically, the premises will feature restrooms and showers adapted for people with disabilities. In addition to construction, the contractor is required to install modern fire alarm systems, video surveillance, and medical staff call systems.

Implementation timeline

Potential bidders have until November 30, 2026, to submit their proposals. According to the project schedule, all works are expected to be completed by the end of the summer of 2027, specifically by August 31.

Source delo.ua — delo.ua/news/ponad-80-mln-grn-na-medicinu-shho-peredbacaje-remont-polik… ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.