LIVE
Saving a Water-Damaged Smartphone: 4 Mistakes to Avoid EU spent more on Russian energy than on aid to Ukraine, European Commission data shows SpaceX hires Washington lobbyists ahead of potential US Congressional probes Geopolitical summit in China: expert assessment of the meeting between US, Chinese, and Russian leaders Strikes on the Crimean Bridge: Economic Impact on Logistics and Shipping EU to Provide €1 Billion for Military Equipment for Ukraine Technological Superiority and the Crimean Bridge: Expert Analysis Zelenskyy Reaffirms Legitimacy of Strikes on Crimean Bridge Russian strike destroys Fresh Production Group's film studio Energy infrastructure in Rivne region damaged by attack: 50 settlements left without power Saving a Water-Damaged Smartphone: 4 Mistakes to Avoid EU spent more on Russian energy than on aid to Ukraine, European Commission data shows SpaceX hires Washington lobbyists ahead of potential US Congressional probes Geopolitical summit in China: expert assessment of the meeting between US, Chinese, and Russian leaders Strikes on the Crimean Bridge: Economic Impact on Logistics and Shipping EU to Provide €1 Billion for Military Equipment for Ukraine Technological Superiority and the Crimean Bridge: Expert Analysis Zelenskyy Reaffirms Legitimacy of Strikes on Crimean Bridge Russian strike destroys Fresh Production Group's film studio Energy infrastructure in Rivne region damaged by attack: 50 settlements left without power

Kherson invests nearly half a billion hryvnias in autonomous heating plants

🏢 Бізнес 1 min read 👁 1

Kherson municipal authorities have signed contracts to build six emergency backup boiler plants to ensure stable heating amid constant shelling.

Kherson invests nearly half a billion hryvnias in autonomous heating plants🏢Бізнес

Photo: 24tv.ua

Key points

  • Construction of six autonomous boiler plants in Kherson
  • Total project budget is 443.9 million UAH
  • Boiler plants to be equipped with protective systems

The Capital Construction Department of the Kherson City Council has initiated a major project to enhance the city's energy resilience. Contracts have been signed for the construction of six emergency backup gas-fired boiler plants to ensure uninterrupted heating for residential areas and critical infrastructure. The total cost of the project is 443.9 million hryvnias.

Protection technologies and procurement specifics

The projects are being implemented under a design-build framework, covering the entire cycle from documentation development to commissioning. A key feature of the new facilities is their autonomy, as they will be equipped with gas-piston generators. Furthermore, the facilities will receive level-one engineering protection, including gabions, to minimize damage risks from enemy drone and missile debris.

Due to the status of the territory as an active combat zone, the procurements were conducted without open auctions. The primary contractors are the "Teplomodul Group" consortium, which received an order for four facilities worth 338.3 million hryvnias, and the "Aqualight" enterprise, which will build two boiler plants for 105.6 million hryvnias.

Source 24tv.ua — 24tv.ua/opalennya-hersoni-hto-zbuduye-novi-avariyni-kotelni-za-444-mily… ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.