LIVE
Saving a Water-Damaged Smartphone: 4 Mistakes to Avoid EU spent more on Russian energy than on aid to Ukraine, European Commission data shows SpaceX hires Washington lobbyists ahead of potential US Congressional probes Geopolitical summit in China: expert assessment of the meeting between US, Chinese, and Russian leaders Strikes on the Crimean Bridge: Economic Impact on Logistics and Shipping EU to Provide €1 Billion for Military Equipment for Ukraine Technological Superiority and the Crimean Bridge: Expert Analysis Zelenskyy Reaffirms Legitimacy of Strikes on Crimean Bridge Russian strike destroys Fresh Production Group's film studio Energy infrastructure in Rivne region damaged by attack: 50 settlements left without power Saving a Water-Damaged Smartphone: 4 Mistakes to Avoid EU spent more on Russian energy than on aid to Ukraine, European Commission data shows SpaceX hires Washington lobbyists ahead of potential US Congressional probes Geopolitical summit in China: expert assessment of the meeting between US, Chinese, and Russian leaders Strikes on the Crimean Bridge: Economic Impact on Logistics and Shipping EU to Provide €1 Billion for Military Equipment for Ukraine Technological Superiority and the Crimean Bridge: Expert Analysis Zelenskyy Reaffirms Legitimacy of Strikes on Crimean Bridge Russian strike destroys Fresh Production Group's film studio Energy infrastructure in Rivne region damaged by attack: 50 settlements left without power

Guaranteed Buyer pays over 34 billion UAH to green energy producers in 2026

🏢 Бізнес 1 min read 👁 7

Settlement levels for renewable energy in the current year have reached 86.6%. However, Ukrenergo's total debt to the state enterprise remains substantial.

Guaranteed Buyer pays over 34 billion UAH to green energy producers in 2026🏢Бізнес

Photo: delo.ua

Key points

  • 2026 settlement rate reaches 86.6%
  • Solar power accounts for 97% of procurement
  • Ukrenergo debt to Guaranteed Buyer exceeds 15 billion UAH

The state-owned enterprise "Guaranteed Buyer" has released a report on payments to renewable energy producers. As of November 20, 2026, the company has disbursed 34.9 billion UAH for electricity generated during the current year, representing an 86.6% settlement rate.

Generation and payment structure

The total volume of "green" electricity purchased in 2026 reached nearly 5 million MWh. Solar power plants accounted for the vast majority of this volume, at 97.25%. The remaining capacity was distributed among bioenergy (1.28%), hydropower (1.24%), and wind power (0.24%).

In addition to current payments, the "Guaranteed Buyer" continues to settle debts from previous periods. In total, over 40 billion UAH has been transferred to producers since the beginning of the year, covering arrears from 2022–2025. Notably, in November, the company fully settled its obligations for May 2026.

The Ukrenergo debt issue

Despite the positive trend, the financial health of the market remains strained due to the debt of NEC "Ukrenergo." The total debt owed to the "Guaranteed Buyer" has reached 15.79 billion UAH, with over 4.5 billion UAH accumulated in the first ten months of 2026 alone.

Source delo.ua — delo.ua/news/riven-rozraxunkiv-z-virobnikami-vde-za-2026-roci-syagnuv-8… ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.